Optimal drying of manure, high capacity, cost-efficient solution

OptiSec is a manure drying tunnel from Big Dutchman developed for optimal and efficient drying of fresh or pre-dried manure from layer/poultry houses, up to a dry matter content of 70%.

OptiSec has 4 to 18 tiers, and is characterised by its large intake capacity, which is achieved by variable lengths, large belt width, and a thick substrate layer.

Technical                 

  • It has 4 to 18 tiers
  • Section number up to 50
  • Large belt width of 1.78 m
  • A substrate layer that is approximately 8 cm thick
  • Manure belt drive has a special pressure unit for good power transmission to the belt
  • A patented roller bearer ensures circulation of the air and smooth running of the belts
  • Integrated with Automated Manure Belt Adjustment (AMBA) system to ensure smooth operation and less maintenance

Advantages of OptiSec

  • Enables optimal and efficient drying of fresh or pre-dried manure
  • Dries up to a dry matter content of 70%
  • Offers high intake capacity due to wide belts
  • Enables very even distribution of the fresh manure on the belts, leading to very uniform drying
  • Integrates the filling station into the top tier, so no additional tier is required

Discover Our Other Products

All
Egg Production
Pig Production
Poultry Production
0-CompoLiner-1553x545
CompoLiner
CompoLiner is an innovative composting system that offers easy handling, as well as a guided, fully automatic process control. The installation is quick and easy, and the system is easily adaptable to...
Read More
Waste-Managment-1553x545
CompoTower
CompoTower is a vertically, enclosed high-quality fermentation system that evaporates the moisture in manure and slurry through a high-temperature fermentation process. The CompoTower process converts...
Read More
0-BD-PelletBox750-1553x545
PelletBox
The BD PelletBox system pelletises dried manure or compost and is ideal for farms or farm complexes. Sensible residue treatment entails pelletising dry material(s) to improve storage stability and transportability....
Read More

Office Details

Office Hours

Visit Us

Contact Us

"*" indicates required fields

Name*
This field is for validation purposes and should be left unchanged.

Our Latest Projects

All
Egg Production
Pig Production
Poultry Production
IMG-20251215-WA0054
Broiler Equipment Installation - Brits
Big Dutchman Southern Africa recently completed a broiler equipment installation in Brits, supplying a full range of systems to support efficient and controlled poultry production. The project scope included...
Read More
IMG-20251215-WA0068
Broiler Equipment Installation - Koster
Big Dutchman Southern Africa successfully delivered a comprehensive broiler equipment installation for a large-scale broiler house in Koster,designed to accommodate 50,000 birds. The scope of this project...
Read More
IMG-20251215-WA0101
Broiler Equipment Installation – Rustenburg
Big Dutchman Southern Africa recently completed a broiler equipment installation across four broiler houses in Rustenburg, delivering advanced climate control and ventilation solutions tailored to the...
Read More